Volumetric
Useful when occupancy must start soon after set. Ask for module weight and the crane lift plan.
Application to purchase requirements
A brand search rarely states whether the building is a site office, a classroom, a camp unit or a workshop. NorthBridge Sourcing is an independent sourcing partner. It does not claim authorized dealer status. The method labels below are comparison axes for the use you actually have.
Useful when occupancy must start soon after set. Ask for module weight and the crane lift plan.
Useful when the road limits box width. Ask which trades close the envelope on site.
Useful when several units share one trailer. Record both folded and opened dimensions.
Useful for clear-span workshops. Record eave height, bay spacing and door openings together.
State headcount, meeting rooms and whether the unit is relocatable after the job. Floor design live load for a crowded meeting room is not the same as storage.
Ask which accessibility route, restroom and fire-resistance rating the jurisdiction expects. A sales floor plan is not a school approval.
Count beds, showers and kitchen seats separately from the sleeping module. Utility scope for water and power is often outside a shell price.
Clear span, eave height and a crane or forklift path change secondary framing. Purlin and girt layout should match the opening schedule.
Give the project city or county and the code the authority having jurisdiction has adopted. IBC and IRC are not interchangeable with HUD Code. Cold-formed steel houses and hot-rolled frames can both be legitimate; the calculation set has to match the system that is quoted. Ground snow load in psf and wind speed in mph are site values, not catalog slogans.
Write the destination, road limits and who supplies the crane. A volumetric module that fits the highway may still miss the gate. A flat-pack or panel stack shifts labor to the site. Record the foundation interface: who designs anchors, who pours concrete, and whether the quote stops at the chassis.
Ask for insulation as R-value or U-value for the assembly being sold, not a generic brochure cell. If a fire-resistance rating is required, name the wall or floor that must carry it. Certificates such as ISO 9001 belong to a plant and a date range. They are items to request, not credentials of NorthBridge Sourcing.
Include quantity, destination and the scope you want priced. Shell and turnkey answers should arrive as separate lines.
Request Factory Quotes